getParametri.ERROR: 008
Version not found in DS N of configuration file

XML structures of eBIZ/TC Upstream documents (2008-1)

Introduction to the XML document template

The structure of the XML documents is the very prescriptive part of the eBIZ/TC Upstream framework: using the eBIZ/TC Upstream documents, the prescriptions must be completely respected about structure of the documents, names and coding, optionality or mandatory use of elements, meaning of each element.
Otherwise the documents could be not validable with the XML Schema (that are the only way to check the formal compliance of the documents) or could generate misunderstandings about the meaning of the message on the side of your partners.
The allowable customisations are about the use or not of a document or about the elements of the document that are declared 'optional'; they can be used to simplify the documents (not all the elements are always necessary).

The (template of) eBIZ/TC Upstream documents of each release are on www.ebiz.enea.it or www.moda-ml.org and are represented by:

  • XML Schemas, public but that cannot be modified, they must be used to validate the XML documents.
  • User Guides, that completely describe the structure and the aim of the documents, together with the elements and their coding rules.
  • in some cases, Samples and Stylesheets(XSL) might be available and can be used to visualize with a browser the content of the XML documents. The proposed stylesheets should be considered as a sample or a reference to be used directly or customised or ignored and substituted with custom stylesheets.


release 15/12/2008

Document Yarn dyeing Order Change
Document Yarn dyeing Order Change
(New)
Description Change to the Dyeing commission Order for a yarn
Release date 15/12/2008
Scope
The present guide has been issued to assist the companies of the Textile-Clothing sector in the implementation of the standard XML document type “YARN DYEING ORDER CHANGE”, providing all the instruction required for its use in the context of e-commerce between Dyeing Subcontractors and their Customers shown in the enclosed diagram
All the rules required for the construction and validation of the document are embedded into the specific XML-Schema, which is detailed in section "Implementation guide".
Generalities
The Commissioner sends to the Subcontractor a Yarn dyeing Order Change any time he must modify some conditions of his previous Order (eg. to suspend operations already ordered) or amend errors.
Basic function of the message is to replace an invalid Order with a valid Order, amending:
- suppliable quantities
- dates and places of delivery
- prices
The Order Change can show a number of lines different from the related Purchase Order, when variations/cancellations have occurred so as to create the splitting of an Order Line.
However the sum of the quantities of the lines in the Order Change (confirmed + varied + cancelled) must alway equal the sum of the quantities in the original Order.
Credits GC
Back compatibility New
Resources
Used in Processes
  • Yarn subcontracted manufacturing