getParametri.ERROR: 008
Version not found in DS N of configuration file

XML structures of eBIZ/TC Upstream documents (2011-1)

Introduction to the XML document template

The structure of the XML documents is the very prescriptive part of the eBIZ/TC Upstream framework: using the eBIZ/TC Upstream documents, the prescriptions must be completely respected about structure of the documents, names and coding, optionality or mandatory use of elements, meaning of each element.
Otherwise the documents could be not validable with the XML Schema (that are the only way to check the formal compliance of the documents) or could generate misunderstandings about the meaning of the message on the side of your partners.
The allowable customisations are about the use or not of a document or about the elements of the document that are declared 'optional'; they can be used to simplify the documents (not all the elements are always necessary).

The (template of) eBIZ/TC Upstream documents of each release are on www.ebiz.enea.it or www.moda-ml.org and are represented by:

  • XML Schemas, public but that cannot be modified, they must be used to validate the XML documents.
  • User Guides, that completely describe the structure and the aim of the documents, together with the elements and their coding rules.
  • in some cases, Samples and Stylesheets(XSL) might be available and can be used to visualize with a browser the content of the XML documents. The proposed stylesheets should be considered as a sample or a reference to be used directly or customised or ignored and substituted with custom stylesheets.


release 18/11/2011

Document Knitting-Clothing Commission Order
Document Knitting-Clothing Commission Order
(Compatible)
Description Knitting/clothing commission order
Release date 18/11/2011
Scope to be defined
Generalities
The knitting-clothing commisio is used by the Knitwear or Clothing Company to commit to a Sub-contractor the manufacturing of knitwear or clothing articles

Each commission order can include one or more operations of the manufacturing cycle, each one correspondind to a line item

The document can be used either to order the manufacturing of finished goods or of component parts of them.

When the Commissioner orders a sequence of operations to different Sub-contractors, he can use this document also to dispose the delivering of semifinished goods from one Sub-contractor to the next.
This document specifies only the technology (when necessary) and the characteristics of the final product and of the initial goods (components) to be used in the manufacturing

The output product specified in each line item can be the inputcomponent in a following line item also in the same Commission order.
Credits GCf
Back compatibility Compatible
Document Code G040
Resources [Guide]
[XML Schema]
Used in Processes
  • Knitwear subcontracted manufacturing