XML structures of eBIZ/TC Upstream documents (2018-1)

Introduction to the XML document template

The structure of the XML documents is the very prescriptive part of the eBIZ/TC Upstream framework: using the eBIZ/TC Upstream documents, the prescriptions must be completely respected about structure of the documents, names and coding, optionality or mandatory use of elements, meaning of each element.
Otherwise the documents could be not validable with the XML Schema (that are the only way to check the formal compliance of the documents) or could generate misunderstandings about the meaning of the message on the side of your partners.
The allowable customisations are about the use or not of a document or about the elements of the document that are declared 'optional'; they can be used to simplify the documents (not all the elements are always necessary).

The (template of) eBIZ/TC Upstream documents of each release are on www.ebiz.enea.it or www.moda-ml.org and are represented by:


release 5/11/2018

Document Yarn Order Status Report
Document Yarn Order Status Report
(Updated)
Description Status report of a yarn order (indicate the foreseen delivery date)
Release date 05/11/2018
Scope
The present guide has been issued to assist the companies of the Textile-Clothing sector in the implementation of the standard XML document type "YARN ORDER STATUS REPORT”, providing all the instruction required for its use in any context of e-commerce between the Yarn Producers (or their Subcontractors) and their Customers.
All the rules required for the construction and validation of the document are embedded into the specific XML-Schema, which is detailed in section "Implementation guide".
Generalities
The message is issued to report to the Client the status of his Orders and the updated dates of delivery, with the possibility of splitting the order line into several consignements.
The message may concern all the articles ordered (Type = H "historic"), all the articles ordered and not yet delivered (type = C "complete") or just the articles in the “ready for shipment” status (type = S "for shipping").
The status report can be given for each article or for each Order line.
Credits This XML document has been realized with the support of TQR Consortium by Guido Cucchiara, PROGEMA - Gruppo SOI, supported by Thomas Imolesi and Arianna Brutti, XML-Lab (initiative of ENEA and Forum per la Tecnologia dell'Informazione). Other participants: Gustavo Cametti (Lanificio Piacenza), Massimo Perona (Domina srl), Piero De Sabbata e Piergiorgio Censoni (ENEA) Subsequent developments in this document have been financed by the eBIZ 4.0 project More information can be acquired in http://www.ebiz.enea.it.
Back compatibility Updated
Document Code G015
Diagrams   +      Diagramm A_Purchaseofyarnproducts
Resources [Guide]
[XML Schema]
[XML]
[XSL]
[XML+XSL]

[Compare version]
Used in Processes
  • Subcontracted yarn manufacturing  
  • Yarn supply